Design of the engineering infrastructure work of the project of reconstruction of buildings that do not meet the requirements for use 1, 2, 3, 4, 6, 9, 10 of the 10th committee of Sukhbaatar district
Customer:
Governor's Office of Capital
Location:
Ulaanbaatar, Sukhbaatar district
Implmented date:
2019
Project details
Design of the engineering infrastructure in accordance with 10.1.4 of the Law on Construction of Mongolia were developed for connecting the drainage system to the new and existing dams, to be supplied from the centralized power supply network, connecting fresh and waste water to the centralized water supply and sewer lines, to pedestrian and public areas.