The first round of electricity supply and engineering preparation for the "Moringi Dava" 1 project /Ulaanbaatar, Khan-Uul District/

The first round of electricity supply and engineering preparation for the "Moringi Dava" 1 project /Ulaanbaatar, Khan-Uul District/

Customer:

The Ministry of Construction and Urban Development

Location:

Ulaanbaatar, Khan-Uul district

Implmented date:

2021

Project details

The design of 110/35/10 kV substation and 110 kV overhead power line of the power supply network was developed. Also, within engineering preparatory measures, a 1,450 m long flood protection channel and a 3,780 m long road rainwater drainage line were designed..